Garbage Compactor Station Structure & Function
Garbage Compactor Station Demand:
With the modernization of various construction and environmental sanitation management, the process of recycling, reducing, harmless, and yielding garbage, as well as the promotion of comprehensive environmental remediation and the implementation of projects, the construction of modern large-scale garbage transfer stations has become a top priority.
Our company is considering: the city is expanding day by day, the city’s population is growing fast, the amount of daily living and commercial waste is increasing, the comprehensive waste treatment (landfill) plant is getting farther and farther from the central urban area, and the cost of waste transfer is increasing.
We have developed and improved a new horizontal garbage compression and transfer equipment (the equipment belongs to: large and medium-sized garbage compression and transfer equipment) , And actively advocate and suggest that large and medium-sized cities use this advanced equipment to build a secondary large-scale garbage compression transfer station
Design Purpose of the Garbage Compactor Station:
1. Design a single garbage station with a maximum daily garbage transfer volume of 80-300 tons;
2. The equipment configuration of the transfer station is mainly practical, it is recommended to configure an environmental deodorization system, working dust reduction and deodorization, and a centralized sewage discharge system; civil construction can reserve a place for the above selection and configuration, which can be used by users according to actual conditions. Make choices based on circumstances and needs.

Design features of Garbage Compactor Station:
1. The design scheme of the garbage compression transfer station adopts rear platform loading and side loading, adopting 1 machine and 1 box; 1 machine and 2 boxes; 2 machines and 2 boxes; 2 machines and 4 boxes... layout, and can adopt the main machine to move or The mobile cabinet has the advantages of reasonable configuration, scientific layout, convenient operation and simple maintenance;

2. In terms of equipment, except the main hydraulic and electrical components are imported products, the rest are processed with domestic high-quality materials. This not only ensures the advancement and reliability of the domestic waste compression transfer station, but also reduces its manufacturing cost;

3. The garbage compression process adopts an advanced horizontal pressing type, which has the advantages of low height of supporting buildings, low capital investment in equipment, high reliability and safety, convenient operation, and high efficiency of cleaning and transportation;

4. After pre-compression, 70% of the water in the garbage is squeezed out, and flows into the sewage pipe through the sewage collection tank. The leakage of waste water from the trash can is significantly reduced, which effectively eliminates the secondary pollution generated during the transfer of the trash can;

5. Fully consider the anti-corrosion ability of the equipment: the components that directly contact the garbage such as garbage pre-compression bins, hoppers, garbage compression bins, compression pushers, garbage containers, etc., are all made of high-quality low-alloy high-strength board Q345B that has undergone special corrosion-resistant treatment. The thickness is 6mm, which greatly improves its service life;

6. The garbage collection process meets the requirements of diversified garbage collection vehicles entering the station and directly loading and dumping garbage. It has the advantages of simplicity, convenience, high efficiency, low pollution, good working environment, and low labor;

7. The garbage transfer station can be equipped with an advanced dust removal and deodorization system to ensure that the air quality in and around the garbage transfer station meets the national environmental protection requirements.
Garbage Compression Station Capacity:
8 cubic meter,
10 cubic meter,
12 cubic meters,
15 cubic meters,
18 cubic meters






