+86-27-84766488info@clw-autos.com
Successful Case
Home > Successful Case > Content

Breaking: 100 Dongfeng CNG Truck Tractors with 45K-Liter Fuel Trailers Delivered to Nigeria's NNPC

[Abuja, Nigeria | Jun. 8, 2024] – In a major boost to Nigeria's clean energy transition, the Nigerian National Petroleum Company (NNPC) has taken delivery of 100 cutting-edge CNG fuel transport systems from Dongfeng Commercial Vehicles and CLW Group. The customized 440HP KC CNG Truck Heads with 45,000L tanker trailers represent Africa's largest deployment of compressed natural gas fuel transporters.

 

 

Dongfeng KC 440HP Truck Head Highlights:

 

DONGFENG CNG TRUCK 3

 

Powertrain:

  • YC6K1344N CNG engine (440HP/2,100Nm torque)
  • 16×260L CNG cylinders (4,160L total capacity) for 1,200km range
  • 12-speed manual transmission (12JSD200T) with crawler gears

Operational Durability:

  • 315/80R22.5 tubeless tires (11-count) for heavy payloads
  • 50,000km service intervals

Driver-Centric Design:

  • Reinforced steel cab with electrical tilt mechanism
  • Air suspension seat + climate control
  • 75dB cabin noise rating

NNPC-Compliant 45,000L Tanker Trailer:

 

DONGFENG CNG TRUCK 2

 

Safety Features:

  • Double-wall construction (10mm steel)
  • Vapor recovery system
  • 4-compartment design (Diesel/CNG/PMS/AGO configurable)

Operational Efficiency:

  • 8,000L/hr loading rate
  • ±0.5% metering accuracy
  • 25-year design lifespan

Strategic Impact

30% lower fuel costs vs diesel fleets
22% reduction in CO₂ emissions per kilometer
35% increase in payload efficiency over previous NNPC assets

 

"The 440HP torque output handles our northern routes' elevation changes while the CNG system cuts operational costs by $18,000 annually per truck," noted NNPC's Head of Fleet Operations during the commissioning ceremony.

 

Local Value Creation

  • $7.2 million in local component procurement (axles, piping)
  • 120 technicians trained at Port Harcourt CNG Academy
  • 5-year maintenance agreement with Lagos-based service centers

Next Phase:
The consortium plans to establish a CKD assembly plant in Edo State by 2026, potentially creating 300+ jobs.

 

Technical Comparison Table

Specification Previous NNPC Fleet New Dongfeng-CLW System Improvement
Fuel Capacity 38,000L diesel 45,000L multi-fuel +18%
Range 800km 1,200km CNG +50%
Payload 32,000kg 38,000kg +19%
Maintenance Cost $0.38/km $0.27/km -29%

 

Products Photos

 

DONGFENG CNG TRUCK 1

DONGFENG CNG TRUCK 2

DONGFENG CNG TRUCK 3

DONGFENG CNG TRUCK 4

DONGFENG CNG TRUCK 5

 

Contact:

Address: Chengli Automobile Industry Park, Suizhou,Hubei, China
Email: yang@clw-autos.com
Phone: +86-27-84766488
Website: www.clw-autos.com