12Ton Garbage Compactor Station Working in CLW Factory
Garbage Compactor Station Working In CLW Group
Mobile Garbage station
Advantage:
1. Large amount of garbage loaded, an process 40-200 tons of garbage each day.
2. Low requirement of seting up, flat open space and 380V power supply, it can be operated, and it is suitable for setting up as a temporary garbage transfer point.
3. Garbage is completely enclosed and stored, so that it is not easy to emit odor and the sewage does not overflow.
4. Inner layer is a stainless steel storage barrel, which is completely corrosion-resistant, sturdy and durable.
5. the volume change shows an axial linear change, the volume is freely selected, and the garbage is cleaned every day.
Main Structure of Garbage Station:
1. Compressor Head
2. Main body
3. Rear Door & Locking Device
4. Hydraulice System
5. Electrical Control System
6. Garbage Dumper
7. Wire Remote Control
Garbage Loading & Compressing in the Garbage Station.

Garbage Box with Rear Door
Box made of heavy duty steel in 5mm-6mm

Garbage Box Transported by Hook lift Garbage
Can do hydraulic dumping at garbage site.


Electrical Input Point

380V Industry Use Power Supplying Box

Computer Control System-PLC- With Screen Displayed.

Wire Control Panel with Emergency Stop Key







